Big Flat Road at Hurdygurdy Creek Bridge Replacement Project

  • Status: Active. Project in construction engineering phase.
  • Location: Big Flat Road at Hurdygurdy Creek near the community of Big Flat, CA
  • Lat./Long.: 41.717660°/-123.897978°
  • Project Activities: post construction environmental monitoring and reporting of bridge replacement mitigation area
  • Project Length: 2018-2023
  • RFP: none
  • Project funded with Highway Bridge Program funds and Toll Credits.
  • Caltrans Project Number: BRLO-5901(057)
  • Last updated: 2020-06-22

Del Norte County CSA No. 1 and Crescent City Lift Station Rehabilitation Project

  • Status: Active. Phase I of project construction complete. Phase II of project under construction.  
  • Location: Various CSA No. 1 and City of Crescent City Lift Stations in Crescent City, CA
  • Lat./Long.: Various
  • Project Activities: Phase I includes replacement of pumps, valves, motors, and other lift station appurtenances in 3 lift stations. Phase II includes installation of SCADA in all 21 lift stations
  • Construction Year: 2020
  • Bidding: complete
  • Construction Management RFP: not anticipated
  • Project funded with Proposition 84, City of Crescent City, and CSA No. 1 funds.
  • Last updated: 2020-06-22

Hunter Creek Bridge Replacement Project

  • Status: Active. Project in preliminary engineering phase.
  • Location: Requa Road at Hunter Creek in Klamath, CA
  • Lat./Long.: 41.553424°/-124.057235°
  • Project Activities: bridge replacement
  • Construction Year: 2021
  • Bidding: Date TBD
  • Construction Management RFP: Anticipated, Date TBD
  • Project funded with Highway Bridge Program funds and Toll Credits.
  • Caltrans Project Number: BRLO-5901(044)
  • Last updated:  2020-06-22

Onsite Emergency Power Supply for Sanitary Sewer Lift Stations
  • Status: Active. Awaiting funding.
  • Location: Various CSA No. 1 Lift Stations
  • Lat./Long.: Various
  • Project Activities: install generators and protective structures at lift stations
  • Construction Year: TBD
  • Bidding: date TBD
  • Construction Management RFP: not anticipated
  • Project funded with Proposition 1 and CSA No.1 funds.
  • Last Updated: 2020-06-22

Pebble Beach Drive Storm Damage Project

  • Status: Active. Project in preliminary engineering phase.
  • Location: Pebble Beach Drive from City Limits to Hemlock Avenue in Crescent City, CA
  • Lat./Long.: 41.753528°/-124.214491° to 41.762987°/-124.227693°
  • Project Activities: 2016 storm damage repair
  • Construction Year: 2021
  • Bidding: date TBD
  • Construction Management RFP: anticipated, date TBD
  • Project funded with Emergency Relief Program and Regional Surface Transportation Program.
  • Caltrans Project Number: ER-32D0(009)
  • Last updated: 2020-06-22

Washington Boulevard Culvert Replacement Project

  • Status: Active. Awaiting funding.
  • Location: Washington Boulevard (east of Harrold Street)
  • Lat./Long.: 41.772710°/-124.196774°
  • Project Activities: culvert replacement
  • Construction Year: TBD
  • Bidding: date TBD
  • Construction Management RFP: anticipated, date TBD
  • Project funded with Highway Infrastructure Program and Regional Surface Transportation Program.
  • Caltrans Project Number: HIPL-5901(061)
  • Last updated: 2020-06-22



Bess Maxwell SRTS Project

  • Status: Project complete.

  • Location: El Dorado Street (Pacific Avenue on the south to Del Norte High School on the north) in Crescent City, CA

  • Lat./Long.: 41.768507°/-124.209254° (north), 41.758277°/-124.209230° (south)

  • Project Activities: curbs, gutters, sidewalk, signage, striping, HMA overlay

  • Construction Year: 2018

  • Bidding: complete

  • Construction Management RFP: none anticipated

  • Project funded with Community Development Block Grant funds.

  • Last updated: 2020-06-22


Big Flat Road at Hurdygurdy Creek Bridge Replacement Project

  • Status: Construction complete.

  • Location: Big Flat Road at Hurdygurdy Creek near the community of Big Flat, CA

  • Lat./Long.: 41.717660°/-123.897978°

  • Project Activities: bridge replacement

  • Construction Year: 2017-2018

  • Bidding: complete

  • Construction Management RFP: complete

  • Project funded with Highway Bridge Program funds and Toll Credits.

  • Caltrans Project Number: BRLO-5901(045)

  • Last updated: 2020-06-22


Elk Valley Cross Road Corridor Plan

  • Status: Document complete.

  • Location: Elk Valley Cross Road from Elk Valley Road to Lake Earl Drive, including US 199 and US 101.

  • Lat./Long.: Various

  • Project Activities: study needs for potential improvements along Elk Valley Cross Road

  • Planning Years: 2019-2020

  • A joint project of the County of Del Norte and Del Norte Local Transportation Commission.

  • Project funded with Regional Planning Assistance funds through the Del Norte Local Transportation Commission.

  • Last updated: 2020-06-22


Regional Systemic Safety Analysis Report

  • Status: Document complete.
  • Location: Del Norte County Region including the City of Crescent City
  • Lat./Lon.: Various
  • Project Activities: Regional Systemic Safety Analysis Report
  • Consultant RFP: complete
  • Project funded with Systemic Safety Analysis Report Program funds and Regional Planning Assistance funds.
  • Caltrans Project Number: SSARPL-5901(055)
  • Last updated: 2020-06-22

Sanitary Sewer Lift Station Rehabilitation Project

  • Status: Project complete.
  • Location: Various CSA No. 1 Lift Stations in Crescent City, CA
  • Lat./Long.: Various
  • Project Activities: replacement of pumps, valves, motors, and other lift station appurtenances in approx. 7-9 lift stations
  • Construction Year: 2016-2017
  • Bidding: complete
  • Construction Management RFP: not anticipated
  • Project funded with Indian Health Service funds courtesy of the Elk Valley Rancheria and CSA No. 1 funds.
  • Last updated: 2020-06-22

Summary of Wonder Stump Road Community and Stakeholder Engagement

  • Status: Document complete.
  • Location: Wonder Stump Road from the Younkers Creek Bridge to Highway 101 (the less than two-lane portion of Wonder Stump Road)
  • Lat./Long.: northern termini (41.840005,-124.143901), southern termini (41.825100,-124.151473)
  • Project Activities: Compile community and stakeholder input on potential improvements to Wonder Stump Road.
  • Planning Years: 2019-2020
  • Project funded with Regional Planning Assistance funds through the Del Norte Local Transportation Commission.